Home   -   News   -   Pricelists   -   Manuals   -   Brochures   -   Distributors   -   Links   -   About APW   -   Contact   -   Sitemap
NederlandsEnglishFrench
 
Home > Work trough leg
01 | 08 | 2010
Work trough construction Print E-mail

The work trough leg is the solution to create a dry working place when you can't use a scaffolding construction. This construction can be placed against the wall very easily.

Specially when working with a large opening in a house, the work trough leg can be placed in front of this open space. Renovation can continue, even when it rains.

Besides that it's easy to place a small rolling tower (75 cm.) underneath the work trough system.

The unique head construction makes it possible to secure the whole piece in the gutter.

 

Sizes

The construction is height adjustable from 4.20 to 6.20 m. and available in the lengths of 1.90 / 2.50 / 3.05 / 4.00 meter, depending on which braces you would use.

 

Needed

For a work trough construction you need the following parts:
2 x work trough leg (art. no. 70890000)
1 x sail in desired length *
1 x double guardrail brace in desired length *
3 x horizontal brace in desired length *

Additional head sails can be added to this construction.

* the construction can be combined with different brace lengths; 190, 250, 305 or 400 cm.
 

Pictures